Kaolin Mine

  • Scope definition and project quotation was issued and reports on costs, schedules and quality were developed.

  • WECE managed the project for cost, schedule, quality variations and scope changes.

  • A Gantt chart and risk management reports were developed to manage schedules and potential risk for the project.

  • Execution of detailed electrical and control system design and completed detailed engineering design of main switchboard, motor control centres, power distribution control system and network design.

  • Engineering and installation procedures were verified according to Australian Standards, namely AS3000, AS3008 and AS4024.

  • Site acceptance testing and commissioning support.

Scope

I/O Count

710

Drives

67

MCC Capacity

4,800A